Bring the complete equipment picture
List the major appliances and equipment you use today, along with planned additions such as air conditioning, a water heater, workshop equipment or an EV charger. Explain which items may run at the same time.
Separate the possible scopes
A circuit addition, a panel replacement and a service-capacity change are different projects. The evaluation establishes which work is appropriate and whether coordination with other parties is needed. We do not promise that an empty breaker space means sufficient capacity.
Plan access and downtime
Tell us about business hours, tenant access and equipment that cannot be interrupted without planning. The work window, affected areas and responsibilities should be agreed before scheduling.